Search results

1 – 5 of 5
Article
Publication date: 4 June 2020

Anas Moussa Al Refaie, Ali M. Alashwal, Zulkiflee Abdul-Samad and Hafez Salleh

Climate change and global warming have increased concerns over the influence of weather on workers' health and productivity in construction projects. A significant number of…

Abstract

Purpose

Climate change and global warming have increased concerns over the influence of weather on workers' health and productivity in construction projects. A significant number of studies can be found in the weather and productivity interplay area. The purpose of this paper is to review the recently published papers in this area to explore the trends of research and topics discussed and to determine knowledge gaps and directions for future research.

Design/methodology/approach

Recent papers published between 2014 and 2019 were synthesized, reviewed and analyzed using bibliometric and text mining analysis.

Findings

The results revealed the trends of publications, the main authors contributed to this area and countries that attracted most of the research papers. Based on the review, this study presented a taxonomy of studies consisting of seven clusters, namely productivity management, seasons, weather factors, participants' conditions, uniform and clothing, work time and health and safety.

Originality/value

This review paper sheds a light into the topics discussed in this area, the interrelationship between the topics and the significant topics that should be continued in the future. Global warming concerns necessitate the need for more studies in tropical countries and countries that are expected to expose to high temperatures and heat stress, which greatly impact labor productivity. The paper highlighted the need to understand how weather influences workers' psychological conditions and subsequently their productivity.

Details

International Journal of Productivity and Performance Management, vol. 70 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 15 April 2022

Caryn Khye Lyn Tan and Zulkiflee Abdul-Samad

This paper aims to study the reaction of construction project managers in coping with workforce productivity challenges that arise from the COVID-19 pandemic.

1493

Abstract

Purpose

This paper aims to study the reaction of construction project managers in coping with workforce productivity challenges that arise from the COVID-19 pandemic.

Design/methodology/approach

Quantitative research via questionnaires targeting the project managers from G7 contractor companies in Malaysia was carried out in the data collection process. In total, 182 responses have been analysed descriptively and inferentially using SPSS software.

Findings

The research discovers that most of the construction projects and their workforce productivity were adversely impacted by the COVID-19 pandemic. Besides, the strategies adopted by project managers in Malaysia and the ranking of strategies based on their effectiveness were indicated.

Originality/value

The findings of this research have contributed to a new understanding of the construction workforce productivity during the COVID-19 era from the perspective of project managers in Malaysia. A guideline established from the ranking of strategies would be useful to ensure the survival of the industry in Malaysia aftermath of the COVID-19 pandemic.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 8
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 16 September 2022

Anas Al-Refaie, Ali Alashwal, Zulkiflee Abdul-Samad, Hafez Salleh and Ahmed Elshafie

Weather is one of the main factors affecting labour productivity. Existing weather-productivity models focussed on hot and cold climates paying less attention to the tropics. Many…

Abstract

Purpose

Weather is one of the main factors affecting labour productivity. Existing weather-productivity models focussed on hot and cold climates paying less attention to the tropics. Many tropical countries are expected to be the most areas affected by accelerated climate change and global warming, which may have a severe impact on labour health and productivity. The purpose of this paper is to assess whether the existing models can be used to predict labour productivity based on weather conditions in the tropics.

Design/methodology/approach

Five models are identified from the literature for evaluation. Using real labour productivity data of a high-rise building project in Malaysia, the actual productivity rate was compared with predicted productivity rates generated using the five models. The predicted productivity rates were generated using weather variables collected from an adjusting weather station to the project.

Findings

Compared with other models evaluated in this paper, the United States Army Corps of Engineers (USACE) was found to be the best model to predict productivity based on the case study data. However, the result shows only a 57% accuracy level of the USACE model indicating the need to develop a new model for the tropics for more accurate prediction.

Originality/value

The result of this study is perhaps the first to apply meteorological variables to predict productivity rates and validate them using actual productivity data in the tropics. This study is the first step to developing a more accurate productivity model, which will be useful for project planning and more accurate productivity rate estimation.

Details

Built Environment Project and Asset Management, vol. 13 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 27 September 2022

Mohd Azrai Azman, Zulkiflee Abdul-Samad, Boon L. Lee, Martin Skitmore, Darmicka Rajendra and Nor Nazihah Chuweni

Total factor productivity (TFP) change is an important driver of long-run economic growth in the construction sector. However, examining TFP alone is insufficient to identify the…

Abstract

Purpose

Total factor productivity (TFP) change is an important driver of long-run economic growth in the construction sector. However, examining TFP alone is insufficient to identify the cause of TFP changes. Therefore, this paper employs the infrequently used Geometric Young Index (GYI) and stochastic frontier analysis (SFA) to measure and decompose the TFP Index (TFPI) at the firm-level from 2009 to 2018 based on Malaysian construction firms' data.

Design/methodology/approach

To improve the TFPI estimation, normally unobserved environmental variables were included in the GYI-TFPI model. These are the physical operation of the firm (inland versus marine operation) and regional locality (West Malaysia versus East Malaysia). Consequently, the complete components of TFPI (i.e. technological, environmental, managerial, and statistical noise) can be accurately decomposed.

Findings

The results reveal that TFP change is affected by technological stagnation and improvements in technical efficiency but a decline in scale-mix efficiency. Moreover, the effect of environmental efficiency on TFP is most profound. In this case, being a marine construction firm and operating in East Malaysia can reduce TFPI by up to 38%. The result, therefore, indicates the need for progressive policies to improve long-term productivity.

Practical implications

Monitoring and evaluating productivity change allows an informed decision to be made by managers/policy makers to improve firms' competitiveness. Incentives and policies to improve innovation, competition, training, removing unnecessary taxes and regulation on outputs (inputs) could enhance the technological, technical and scale-mix of resources. Furthermore, improving public infrastructure, particularly in East Malaysia could improve regionality locality in relation to the environmental index.

Originality/value

This study contributes to knowledge by demonstrating how TFP components can be completely modelled using an aggregator index with good axiomatic properties and SFA. In addition, this paper is the first to apply and include the GYI and environmental variables in modelling construction productivity, which is of crucial importance in formulating appropriate policies.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 July 2019

Selladurai Pitchaimuthu, Jitesh J. Thakkar and P.R.C. Gopal

Risk management in defence aircraft industry has considerable interest among academics and practitioners. The purpose of this paper is to develop interactions among risk factors…

Abstract

Purpose

Risk management in defence aircraft industry has considerable interest among academics and practitioners. The purpose of this paper is to develop interactions among risk factors dimensions (RFDs) and inspect the importance relationship among the performance measures in Indian aircraft industry and, finally, understand the effect of involvements provided by the managerial team on risk reduction process.

Design/methodology/approach

An extensive literature review was carried out to identify 26 risk parameters and 13 performance measure indices relevant for an aircraft industry. Survey method was used to obtain the importance of these parameters and measures. Further, these factors are grouped into five risk dimensions based on the brain storming session by the project managers. Initially, Risk factors for defense aircraft industry (RFDs) analyzed by Interpretative structural model (ISM) to know the contextual relationship among the RFDs and then applied Interpretive ranking process (IRP) to inspect the pre-eminence relationship among them. Finally, SD is applied to understand the effect of involvements provided by the managerial team on risk reduction process.

Findings

Government policy and legal RFDs has emerged as the key driving RFDs. In IRP modelling, technology RFD has emerged as more influential RFD which is the more relevant factor with respect to performance measure indices and this result is supported by detailed sensitivity analysis of system dynamic model.

Originality/value

The outcomes of this research can help project management team to identify the high severity risk factors which need immediate risk reduction/mitigation action.

Details

Measuring Business Excellence, vol. 23 no. 3
Type: Research Article
ISSN: 1368-3047

Keywords

1 – 5 of 5